SB 9 lot splits in Solana Beach

Can you split your lot in Solana Beach?

Yes, but with an extra step. The whole city is in the Coastal Zone and its coastal rules aren't certified, so the city code requires a coastal development permit from the California Coastal Commission before it accepts the SB 9 application (SBMC 16.48.030(C)).

Free, about 30 seconds, no signup to see your answer.

Solana Beach

Can you split your property in Solana Beach?

Solana Beach homeowners face an additional Coastal Act review when considering an SB 9 lot split. Coastal permitting, local height standards and usable parcel area can significantly affect whether a project works.

Related: SB 9 in the Coastal Zone, the statewide SB 9 rules, SB 9 lot split costs, and the free lot checker.

The Solana Beach rules

SB 9 eligibility requirements in Solana Beach

Governing rules: Solana Beach Ordinances 521 and 533 (SBMC 16.48, 17.20.040(R)), on top of state law (Cal. Gov. Code §§65852.21, 66411.7).

New lot size1,200 sq ft and 40%Access over land you own or a recorded easement.
Side and rear setbacks4 ftNone for an existing structure rebuilt in place.
Height (city code)16 ftSBMC 17.20.040(R)(4)(d): effectively one story for new SB 9 homes. The zone allows 25 ft.
Floor area0.60, 0.30, 0.15Tiered by lot size, but it must allow two 800 sq ft homes.
Parking1 space per homeState law's transit exemption may apply near the Coaster station.
Coastal permitCoastal CommissionRequired before the city takes the application.
What's different here

Local access and development rules

State-law limitations and possible conflicts (city confirmation recommended)

These are on the city's books, but SB 9 and later state housing laws may limit them. Our checker flags them for a hand look instead of ruling a lot out.

Coastal Zone

Coastal Zone and access

All of Solana Beach is in the Coastal Zone, and the Coastal Commission, not the city, issues the coastal permit.

Every lot also needs a way to reach the street: a corner, an alley, or a strip down the side of the house. That strip is often what decides whether a Solana Beach lot splits.

Costs

Published city fees and potential costs

Published fee categories are informational, not a project quote. Applicability and total expenses depend on the city, parcel, proposed construction and current agency requirements. Schedule: Impact fees per new home (schedule of January 1, 2026).

Transportation$19,784
Park development$7,631
Fire mitigation$1,941
Public use facilities$706
Sewer connection$4,500 per EDU (equivalent dwelling unit)

The city lists no urban lot split fee; the closest is a minor subdivision parcel map at $5,528. Coastal Commission fees are separate. These are published city fees or the closest fee categories on the city's schedule, not a quote for an SB 9 application. Real costs depend on the project, required reviews, utilities and current schedules; survey, engineering, school, utility and recording costs are extra. Who pays what is set out in the written agreement for the new lot. City fee schedule.

Selling the new lot

Selling a newly created lot in Solana Beach

Yes. Once the split records, the new lot is a separate legal parcel you can sell on its own, and you keep your house on the other one. Sell it direct and there's no realtor commission: In a direct sale without a homeowner listing agent, no listing-agent commission is charged to the homeowner. Escrow, title, lender, tax, permitting, and other expenses may still apply. The written agreement specifies which party pays each cost. See how selling part of your backyard works.

Questions

Solana Beach SB 9 frequently asked questions

Can I split my lot in Solana Beach under SB 9?

Yes, but with an extra step. The whole city is in the Coastal Zone and its coastal rules aren't certified, so the city code requires a coastal development permit from the California Coastal Commission before it accepts the SB 9 application (SBMC 16.48.030(C)).

How small can the new lot be in Solana Beach?

Each lot has to be at least 1,200 square feet, and the smaller lot at least 40% of the original lot. Access over land you own or a recorded easement.

Do I need a coastal permit in Solana Beach?

All of Solana Beach is in the Coastal Zone, and the Coastal Commission, not the city, issues the coastal permit.

How does the Solana Beach SB 9 process work?

Ministerial lot split map by the City Engineer, after the Coastal Commission permit.

Do I pay realtor fees if I sell the new lot?

No. In a direct sale without a homeowner listing agent, no listing-agent commission is charged to the homeowner. Escrow, title, lender, tax, permitting, and other expenses may still apply. The written agreement specifies which party pays each cost.

Check your Solana Beach property for free

Type your address. We check it against the county maps and Solana Beach's rules in about 30 seconds.

Sources

Official rules and sources

City SB 9 rulesSolana Beach Ordinances 521 and 533 (SBMC 16.48, 17.20.040(R))
Published fee scheduleImpact fees per new home (schedule of January 1, 2026). The city lists no urban lot split fee; the closest is a minor subdivision parcel map at $5,528. Coastal Commission fees are separate.
State SB 9 statuteGov. Code §65852.21 and §66411.7
Rules last read from city sourcesSeptember to October 2026
Fees checked against official schedulesOctober 19, 2026
Other cities

Rules read from the city's published code and fee schedules; last reviewed October 2026. Check with the city before you rely on any single number.